Note:The lower cover panel must be pushed all the way
down. The outer nishing anges should line up. The
replace opening must be between 43 cm and 44 cm for
the decorative fronts to t correctly. See Figure 13.4.
FinishandSealingJoints
All joints between the nished wall sheating and
the appliance must be sealed with non-combustible
materials. Sealants, such as caulk or mastic used to
seal the gap between the wall and the replace, should
be rated at a minimum continuous exposure to 300°
F. Wall board joints can be taped and sealed with
combustible drywall tape.
FinishingAroundOpeningwithGypsumWallboard
Gypsum wallboard (drywall) joints adjacent to the
replace opening require special attention to minimize
potential development of cracking. Hearth and Home
Technologies recommends the following steps to
minimize potential cracks in the nished drywall around
the replace opening:
• When installing gypsum wallboard around the replace,
install the hole for the replace opening in a single
wallboard sheet, if possible. This will minimize the joints
adjacent to the replace opening.
• The factory-supplied non-combustible board and the
gypsum wallboard must join on the structural framing,
where applicable. Wallboard and non-combustible
board should be fastened to the framing with at least
3,2 cm long screw fasteners, located within 3,8 from
each corner, and at no more than 30,5 intervals along
the joint length.
• The wall-board joints should be nished with a Taping
Coat, followed by at least two subsequent Finish Coats
of joint compound.
FIREPLACE OPENING
43 cm TO 44 cm
Figure13.4RequiredFireplaceOpeningHeight
• For the initial Taping Coat, it is critical that a general-
purpose chemically hardening joint compound, such as
SHEETROCK™ Brand Durabond™ Setting-Type Joint
Compound, be used to ll the joint and embed the mesh
tape. Fiberglass-mesh tape is recommended because it
will provide a more crack-resistant joint than one nished
with paper tape. Let the Taping Coat properly cure before
applying subsequent Finish Coats.
•For the second and third nishing coats, it is acceptable
to use a light-weight joint compound and standard
application, curing and sanding methods.
•Do not operate the replace during the drywall nishing
process. Allow the nish coat to cure for at least 24
hours prior to using the appliance.
Painting
If desired nishing includes a painted wall, 100% acrylic
latex with compatible primer is recommend around the
appliance. Oil-based or standard acrylic paints may
discolor due to heat exposure.
WallboardJoint-CrackPreventionandRepair
Wallboard joints around the replace will be affected by
exposure to elevated temperatures, along with other en-
vironmental and structural factors. The specic methods
presented in the previous section will help prevent or
minimize development of cracks.
If a crack does emerge adjacent the replace, it can be
permanently repaired by lling it with spackling paste or
paintable latex caulk, followed by repainting.