Hearth and Home Technologies NorthStar-NT Indoor Fireplace User Manual


 
Page 26
Heat & Glo • NorthStar EPA Fireplace • 480-1081C
September 1, 2008
September 1, 2008
September 1, 2008
Figure 26.1 Ceiling/Attic Construction
Fire Risk
• Mustmaintain2in.(51mm)airclearance
to insulation and other combustible
materials.
WARNING
Mark the Exit Point of the Roof
Locate the point where the chimney will exit the roof by
plumbing down to the center of the chimney. Drive a nail
up through the roof to mark the center. See Figure 26.1.
• Cut Out the Hole in the Roof
Measuretoeithersideofthenailandmarkthe14-1/2in.
x14-1/2in.(368mmx368mm)openingrequired.This
is measured on the horizontal; actual length may be larg-
er depending on the pitch of the roof. Cut out and frame
the opening. See Chapter 25 of the Uniform Building
Code for roof framing details.
• Assemble the Chimney Sections Through the
Roof
Continue to add chimney sections through the roof open-
ing, maintaining at least a 2 in. (51 mm) air space to com-
bustible materials.
• Install the Roof Flashing
Ifaroofashingistobeused,installtheroofashing
appropriate to the roof pitch and install a termination cap
and storm collar following the instructions shipped with
the cap.
For chase installations you can use a round termination
cap, a round telescoping termination cap or a square
termination cap (See pages 62). A chase installation
must use a chase top. Chase tops are available from your
dealer. See page 14 for building a chase.
• Install the Chimney Air Kit (required in Canada):
When installing the chimney air kit, follow the instructions
provided with this accessory. See page 22.
Completion of the Enclosure
Complete thereplace enclosure,allowingspacefor
outside air ducts. Electrical wiring should not come in
contactwiththereplace.A minimum clearance of 1 in.
(25 mm) must be maintained between the replace
back and 1 in. (25 mm) minimum clearances to sides
and the enclosure.
NOTE: Wiring for fans must be done before framed
enclosure is completed. If using a Heat Zone kit, it also
must be installed before enclosure is complete.