ULTRA FLAME DV “0” Clearance Fireplace
VENT TERMINAL, ROOF INSTALLATION
Roof vents are required to extend at least 3 ft. above the highest point where they pass through
the roof of the building and at least 2 ft. higher than any portion within 10 feet.
• Clearance between combustible wall and vent pipe must be 2" and a radiation shield must be
used through the insulated wall.
• If the vent terminal is more than 5 feet above the roof, use roof braces to secure the whole
assembly.
OPTIONAL BLOWER INSTALLATION
See the instruction sheet included with the optional blower before proceeding with its
installation.
21