www.desatech.com
119315-01A 11
INSTALLATION
Continued
Actual Framing
Height 23
3
/4" 22
1
/4"
Front Width 19
3
/4" 17
1
/2"
Depth 8
7
/8" 8
7
/8"
Bottom 0" 0"
1. Frame in rough opening. Use dimensions shown
in Figure 7 for the rough opening. If installing in
a corner, use dimensions shown in Figure 8 for
the rough opening. The height is 22
1
/4" which
is the same as the wall opening above.
2. Install gas piping to replace location. This
installation includes an approved exible gas
line (if allowed by local codes) after the equip-
ment shutoff valve. The exible gas line must
be the last item installed on the gas piping.
3. If you have not assembled rebox, follow
instructions on page 6.
4. Carefully set replace in front of rough opening
with back of replace inside wall opening.
5. Attach exible gas line to replace gas regula-
tor. See Connecting Fireplace to Gas Supply,
page 14.
6. Check all gas connections for leaks. See
Checking Gas Connections, page 15.
IMPORTANT: When finishing your firebox,
combustible materials such as wall board, gypsum
board, sheet rock, drywall, plywood, etc. may be
butted up next to the sides and top edge of the re-
box. Combustible materials should never overlap
the rebox front facing.
17
1
/
2
"
22
1
/
4
"
8
7
/
8
"
Figure 8 - Rough Opening for Installing
in Corner
Figure 7 - Rough Opening for Installing
in Wall
29
7
/
8
"
21
1
/
8
"
42
1
/
4
"
17
1
/
2
"
WARNING: Do not allow any
WARNING: Do not allow
WARNING: Never modify or
cover the louvered slots on the
Mantel Clearances for Built-In
Installation
If placing mantel above built-in replace, you must
meet minimum clearance between mantel shelf and
top of replace opening.
minimum clearances shown in
NOTICE: If your installation
does not meet the minimum
-
• remove the mantel