XI Start-up and Checkout
Use the following procedure for initial start-up of the boiler:
1) Make sure that the boiler is filled with water.
2) Check all new gas piping for leaks and purge piping sections that are filled with air. See the National Fuel Gas
Code for additional information on testing and purging gas lines.
3) Verify that vent system is complete and free of obstructions before attempting to fire boiler.
4) Inspect all wiring for loose or uninsulated connections.
5) Make sure the main burners are seated properly in the rear of burner tray and on orifices.
6) Adjust thermostat to the highest setting. Make sure the vent damper (if used) has fully opened.
7) Start the boiler using the appropriate lighting instructions for the gas valve on the boiler on page 34.
NOTE
SAFE LIGHTING AND OTHER PERFORMANCE CRITERIA WERE MET WITH THE GAS MANIFOLD
AND CONTROL ASSEMBLY PROVIDED ON THE BOILER WHEN THE BOILER UNDERWENT THE
TESTS SPECIFIED IN Z21.13.
WARNING
NEVER ATTEMPT TO FILL A HOT EMPTY BOILER
NOTE
The combustion chamber insulation panels in this boiler contain a cornstarch based binder which may emit a strong
odor as it is burned out of the insulation when the boiler is fired for the first time. An hour or more of continuous
firing may be required to burn off all of this binder. Open any windows and outside doors in the boiler room to
maximize ventilation while this binder is burned out.