Carrier 50ZH024-060 Air Conditioner User Manual


 
50ZH024-060
Packaged Heat Pump Units
Installation, Start-Up and Service Instructions
NOTE: Read the entire instruction manual before starting the
installation.
TABLE OF CONTENTS
SAFETY CONSIDERATIONS.....................................................1
INTRODUCTION..........................................................................2
RECEIVING AND INSTALLATION ..........................................2
Check Equipment......................................................................2
IDENTIFY UNIT ................................................................2
INSPECT SHIPMENT........................................................2
Provide Unit Support................................................................2
SLAB MOUNT ...................................................................2
GROUND MOUNT ............................................................2
Provide Clearances....................................................................2
Place Unit..................................................................................2
Select and Install Ductwork .....................................................2
INSTALL FLANGES FOR DUCTWORK CONNEC-
TIONS (50ZH060 ONLY)..................................................6
CONVERTING HORIZONTAL DISCHARGE UNITS TO
DOWNFLOW (VERTICAL) DISCHARGE......................6
Provide for Condensate Disposal.............................................6
Install Electrical Connections...................................................7
HIGH-VOLTAGE CONNECTIONS..................................7
ROUTING POWER LEADS INTO UNIT ........................8
CONNECTING GROUND LEAD TO UNIT
GROUND ............................................................................8
ROUTING CONTROL POWER WIRES ..........................8
ACCESSORY ELECTRIC HEAT WIRING .....................8
SPECIAL PROCEDURES FOR 208-V OPERATION .....8
PRE-START-UP ............................................................................9
START-UP.....................................................................................9
Check for Refrigerant Leaks ..................................................10
LOCATE AND REPAIR REFRIGERANT LEAKS AND
CHARGE THE UNIT AS FOLLOWS: ...........................10
Start-Up Cooling Section and Make Adjustments ................10
CHECKING COOLING CONTROL OPERATION .......10
COMPRESSOR ROTATION ...........................................10
Refrigerant Charge..................................................................10
NO CHARGE....................................................................10
LOW CHARGE COOLING .............................................10
TO USE THE COOLING CHARGING CHART............10
HEATING MODE CHARGE...........................................11
Indoor Airflow and Airflow Adjustments..............................11
FOR 208/230-V.................................................................12
FOR 460-V MOTORS......................................................12
Unit Controls...........................................................................12
HIGH-PRESSURE RELIEF VALVE...............................12
LOSS OF CHARGE SWITCH.........................................12
COMPRESSOR OVERLOAD..........................................12
Sequence of Operation............................................................12
FAN OPERATION............................................................12
COOLING..........................................................................14
HEAT PUMP HEATING..................................................14
DEFROST..........................................................................15
ELECTRIC RESISTANCE HEATING............................15
MAINTENANCE.........................................................................15
Air Filter..................................................................................16
Unit Top Removal (Outdoor-Coil Side) ................................16
Indoor Blower and Motor.......................................................16
Outdoor Coil, Indoor Coil, and Condensate Drain Pan ........16
Outdoor Fan............................................................................17
Electrical Controls and Wiring...............................................18
Refrigerant Circuit ..................................................................18
Indoor Airflow........................................................................18
Metering Devices....................................................................18
Lubrication..............................................................................18
Liquid Line Strainer................................................................18
High Flow Valves...................................................................19
TROUBLESHOOTING...............................................................22
START-UPCHECKLIST............................................................23
NOTE TO INSTALLER—Before installation, READ THESE
INSTRUCTIONS CAREFULLY AND COMPLETELY. Also,
make sure the User’s Manual and Replacement Guide are left with
the unit after installation.
SAFETY CONSIDERATIONS
Installation and servicing of air-conditioning equipment can be
hazardous due to system pressure and electrical components. Only
trained and qualified workers should install, repair, or service
air-conditioning equipment.
Untrained workers can perform basic maintenance functions of
cleaning coils and filters. All other operations should be performed
by trained service people. When working on air-conditioning
Fig. 1—Unit 50ZH
C00155
Visit www.carrier.com
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 6 8
PC 101 Catalog No. 535-00080 Printed in U.S.A. Form 50ZH-5SI Pg 1 7-03 Replaces: 50ZH-4SI