Yeoman PR1145 Stove User Manual


 
14
INSTALLATION INSTRUCTIONS
COMMISSIONING
1. COMMISSIONING
After connecting the gas pipe to the stove:
1.1 PURGE THE SUPPLY PIPE to dispel any debris that might
block the controls.
1.2 Connect the gas supply to the 8mm compression elbow
at the right-hand rear corner of the stove (see Diagram 1).
AR0934
1
1.3 Connect a suitable pressure gauge to the test point on
the inlet fitting.
1.4 Turn on the gas supply.
1.5 Light the stove and check all gas joints for leaks.
1.6 Turn the stove to maximum to check the supply pressure
corresponds with the data badge information.
1.7 Turn the gas off.
1.8 Replace the test point screw.
1.9 Turn the gas on.
1.10 Check the test point for leaks.
To finish commissioning:
1.11 Check the stove complies with all local regulations.
1.12 Check all seals are in good condition.
1.13 Complete the Appliance Commissioning Checklist on
page 3.
1.14 Show the user how to operate the stove.
1.15 Hand the completed instructions to the User for safe
keeping. The information is required when making any
guarantee claims.