White Rodgers HC-TST501CMMS Thermostat User Manual


 
1
2
Select continuous backlight. Scrolling
message will show “BACKLIGHT”.
When bL is selected On the backlight
will be on continuously. Selecting bL
OFF will allow the backlight to turn on
momentarily when any key is touched.
If system power is off and thermostat is
operating on battery only, and bL is On,
bL will turn the backlight on momentarily
when a key is touched.
Select temperature offset. Scrolling
message will show “TEMPERATURE
ADJUSTMENT”. Your thermostat was
accurately calibrated at the factory,
however this option allows you to
change the display temperature to
match your previous thermostat if
you prefer. Default is 0° with current
temperature. Adjustment can be made
from 5° Lo to 5° HI to change the
displayed temperature.
Touch Run Schedule at any time to exit
the Menu and return to Home Screen
Display.
Thermostat Setup
Advanced Installer Confi guration Menu
Life History (LIFE HIST)
Parameter Indications Comments
Total Days Pwrd XXXX Total number of days control has been powered
Lo HT Hrs XXXXXX Low Heat Hours of Operation
Lo HT Cycles XXXXXX Low Heat Cycles
Hi HT Hrs XXXXXX High Heat Hours of Operation
Hi HT Cycles XXXXXX High Heat Cycles
Y1 Hrs XXXXXX First Stage Cooling/Heat Pump Hours of Operation
Y1 Cycles XXXXXX First Stage Cooling/Heat Pump Cycles
Y2 Hrs XXXXXX Second Stage Cooling/Heat Pump Hours of
Operation
Y2 Cycles XXXXXX Second Stage Cooling/Heat Pump Cycles
G Hrs XXXXXX Indoor Blower Hours of Operation
Fault History (FAULT HIST)
Fault Code Fault Occurred Comments
XXXXXXXXXXXXXXX Days XX Displays up to 6 Faults; Days (XX)
indicates how many days ago the fault
occurred
Clear Faults No, Yes
1
2
Furnace User Menus (Cont.)
2 Week History (2 WK HIST)
Parameter Indications Comments
2wk Lo HT Hrs XXX 2 Weeks Low Heat Hours of Operation
2wk Lo HT Cycls XXXX 2 Weeks Low Heat Cycles
2wk Hi HT Hrs XXX 2 Weeks High Heat Hours of Operation
2wk Hi HT Cycls XXXX 2 Weeks High Heat Cycles
2wk Y1 Hrs XXX 2 Week First Stage Cooling/Heat Pump Hours
of Operation
2wk Y1 Cycles XXXX 2 Week First Stage Cooling/Heat Pump Cycles
2wk Y2 Hrs XXX 2 Week Second Stage Cooling/Heat Pump
Hours of Operation
2wk Y2 Cycles XXXX 2 Week Second Stage Cooling/Heat Pump Cycles
2wk G Hrs XXX 2 Week Indoor Blower Hours of Operation
2wk G Cycles XXXX 2 Week Indoor Blower Cycles