Part Number 550-110-711/1108
33
GOLD
CGi-4E Gas-Fired Water Boiler — Boiler Manual
Fill the system with water
1. Closemanualandautomaticair vents and boiler drain cock.
2.
Fill to correct system pressure.Correctpressurewillvarywitheach
application. Typical cold water fill pressure for a residential system is
12 psi.
3.
Purge air from system:
a. Connectahosetothepurgevalve(seedrain valves, item
6, in
suggested piping diagrams on pages 23 through 27, Figure 18
through Figure 23). Route hose to an area where water can drain
and be seen.
b. Closetheboilerorsystemisolationvalvebetweenthepurgevalve
and fill connection to the system.
c. Closezoneisolationvalves.
d. Open quick-fill valve on cold water makeup line.
e. Open purge valve.
f. One zone at a time, open the isolation valves. Allow water to run
through the zone, pushing out the air. Run until no noticeable air
owispresent.Closethezoneisolationvalvesandproceedwith
the next zone. Follow this procedure until all zones are purged.
g. Closethequick-llwatervalveandpurgevalveandremovethe
hose. Open all isolation valves. Watch that system pressure rises to
correct cold-fill pressure.
h. After the system has operated for a while, eliminate any residual
air by using the manual air vents located throughout the system.
i. If purge valves are not installed in system, open manual air vents
insystemoneatatime,beginningwithlowestoor.Closevent
when water squirts out. Repeat with remaining vents.
4. Open
automatic air vent (diaphragm-type or bladder-type expansion
tank systems only) one turn.
5. Open other vents:
a. Startingonthelowestoor,openairventsoneatatimeuntil
water squirts out.
b. Repeat with remaining vents.
6. Refill to correct pressure.
Inspect system water piping
After filling the boiler and system with water, inspect all
piping
throughout the system for leaks. If found, repair
immediately. Repeat this inspection after the boiler has
been started and the system has heated up.
Leaks must be repaired at once.
Failure to do so can damage the
boiler, resulting in substantial prop-
erty damage.
Donot usepetroleum-based
cleaning or sealing compounds
inboilersystem.Severedamageto
boiler will occur, resulting in sub-
stantial property damage.
Inspect base insulation
The boiler contains ceramic fiber
and fiberglass materials. Use care
when handling these materials per
instructions on page 68 of this
manual. Failure to comply could
result in severe personal injury.
Failure to replace damaged insu-
lation or reposition insulation can
result in a fire hazard, causing severe
personal injury, death or substantial
property damage.
Checktomakesure
base insulation is secure against
all four sides of the base. If insulation is damaged or
displaced, do not operate boiler. Replace or reposition
insulation.
Start-up — preparation (continued)7a