GOLD
CGi-4E Gas-Fired Water Boiler — Boiler Manual
16
Part Number 550-110-711/1108
Venting — direct exhaust — vent starter3d
1. Selectaventpipemanufacturerandobtainallvent
components needed, based on boiler location and
venting method.
2. Youmustusetheventstartermadebytheventpipe
manufacturer.Seeseparate
Vent Supplement, for
part number of each component, listed by vent
manufacturer.
Use only the vent starter of the same
manufacturer as the vent compo-
nents. Do not mix components
from different systems. The vent
system could fail, causing flue gas
spillage, resulting in severe personal
injury or death.
3. Follow all applicable national, state, local or provin-
cialcodeswhenventingtheCGi-4Eboiler.
4. Connectventstartertoblowerhousingoutletas
shown in the
Figures 8 through 11.
a. Donotmixcomponentsfromdifferentvent
manufacturers.
b. Maintainminimum2”clearancefromcom-
bustible materials to vent pipe.
c. Sealwithsealantspeciedbyventpipe
manufacturer, using ³⁄₈" bead (not required for
FasNSeal™).
d. Tighten strap at band clamp screw until strap
is snug around blower housing.
Figure 8
FasNSeal™
ventstarter
Figure 9
Z-Vent II
vent starter
Figure 11
StaR-34
vent starter
Figure 10
Saf-T Vent®
vent starter