Trane TR200 Heating System User Manual


 
3.2.1 Lifting 4-3
3.2.2 Hoist or Overhead Lift 4-3
3.2.3 Forklift 4-3
3.2.4 Shipping Weights 4-3
3.3 Cooling
4-4
3.4 Electrical Installation
4-5
3.4.1 Component Identification & Customer Connection 4-7
3.4.2 Wire and Cable Access 4-15
3.4.3 Wire Size 4-19
3.4.4 Wire Type Rating 4-20
3.4.5 Terminal Tightening Torques 4-20
3.4.6 Input Line Connection 4-25
3.4.7 Motor Wiring 4-25
3.4.8 Grounding (Earthing) 4-26
3.4.9 Control Wiring 4-26
3.4.10 Serial Communication Bus Connection 4-27
3.4.11 Drive Control Terminals 4-28
4 Start Up
5-1
4.1.1 Inspection Prior to Start Up 5-2
4.1.2 Start Up Procedure 5-2
5 Electromechanical Bypass (EMB2) Operation
6-1
5.1.1 Typical Control Connections for Common HVAC Applications 6-1
5.1.2 EMB2 Auto Bypass 6-3
5.1.3 EMB2 Common Run/Stop 6-3
5.1.4 EMB2 Run Permissive 6-4
5.1.5 EMB2 Overload 6-4
5.1.6 EMB2 Safety Interlock 6-5
5.1.7 EMB2 Fire Mode 6-5
5.1.8 EMB2 Fault Reporting 6-5
5.1.9 EMB2 Switches 6-6
6 Electronically Controlled Bypass (ECB) Operation
7-1
6.1 Electronically Controlled Bypass (ECB) Operation
7-1
6.1.1 Overview 7-1
6.1.2 ECB Control Card 7-2
6.1.3 ECB Drive or Bypass Selection 7-5
6.1.4 ECB Programming 7-7
Contents
BAS-SVX49A-EN