Toshiba RAV-SM800AT-E Air Conditioner User Manual


 
159
No.
Part name
Pulse Modulating
Valve (PMV) coil
Procedure
1. Detachment
1) Perform works of items and .
2) Release the coil from the concavity by
turning it, and remove coil from the
PMV.
2. Attachment
1) Put the coil deep into the bottom
position.
2) Fix the coil firmly by turning it to the
concavity.
Remarks
Fan guard 1. Detachment
1) Perform works of items 1 of , and .
2) Remove the front cabinet, and put it
down so that fan guard side directs
downward.
CAUTION
Perform works on a corrugated card-
board, cloth, etc. to prevent flaw on the
product.
3) Remove the hooking claws by pushing
with minus screwdriver along with the
arrow mark in the right figure, and
remove the fan guard.
2. Attachment
1) Insert claws of the fan guard in the hole
of the front cabinet. Push the hooking
claws (10 positions) with hands and
then fix the claws.
CAUTION
All the attaching works have completed.
Check that all the hooking claws are
fixed to the specified positions.
Positioning extrusion
PMV body
Concavity
PMV coil
Minus screwdriver
Front cabinet
Hooking claw
Front cabinet
Fan guard