104
Reactor
Partition plate
Screws
Positioning extrusion
PMV body
PMV coil
Concavity
No.
Part name
Reactor
Pulse Modulating
Valve (PMV) coil
Procedure
1) Perform works of items 1 of and .
2) Take off screws fixing the reactor.
(Ø4 x 10L , 2 pcs. per one reactor.
An outdoor unit has two reactors on the
partition plate.)
1. Detachment
1) Perform works of items 1 of and .
2) Remove the coil from PMV body while
pulling it upward.
2. Attachment
1) Match the positioning extrusion of the coil
surely to the concavity of PMV body to fix it.
Remarks