Thermo Products OPB (24 Air Conditioner User Manual


 
All installations and services must be performed by qualified service personnel.
IV. STARTUP PROCEDURES
A. Heating System
1. Initial Startup:
: Turn off power to furnace. Before the oil piping system is placed
into service, it must have been leak tested by a qualified heating
contractor.
: For initial start-up of the appliance after installation, it may be
necessary to purge the air out of the oil line. A qualified heating contractor
should do this.
Review the following items before the initial startup. It may be helpful to review
the Sequence of Operations in Appendix D of this manual, also.
a. Check all wiring for loose connections and proper hook-up. Refer to the
connection diagram.
b. Leak test all field oil piping connections. Generally, this will involve
pressurizing the oil piping with air while being careful to isolate the oil tank at
high test pressures. A qualified heating contractor should perform this
service.
c. Check to see that the vent terminal is correctly installed and the terminal
openings are clear and free from blockage.
d. Make sure the air filter is in place and relatively clean of dirt and debris.
e. Make sure the thermostat is set in the heating mode of operation.
31