Regency L676E-LP Indoor Fireplace User Manual


 
Regency
®
L676E Direct Vent Gas Fireplace
12
INSTALLATION
INSTALLATION
SIDE NAILING STRIPS
The side nailing strips come attached to the unit.
There are 3 plates, one on the top and bottom
that can be folded out as required.
UNIT ASSEMBLY
PRIOR TO
INSTALLATION
The Top Facing Support, the Side Nailing Strips
and the 2 Top Standoffs must be correctly
positioned and attached to the top before unit
is slipped into position.
TOP STANDOFF ASSEMBLY
The top standoffs are shipped in a fl at position
and must be folded into shape and attached.
1) Remove the standoffs from the fi replace
top.
2) Take each standoff and bend into the correct
shape. Bend up at the bend lines until the
screw holes in the standoff and the pre-
punched screw holes on the fi replace top
line up.
3) Attach the standoff securely to the top
with 2 screws per standoff (on opposite
corners).
Side Nailing Strips shown folded out.
FINISHING TEMPLATE
In order to maintain a clean face; the L676E
allows for a 1/8” in overlap of fi nishing material,
such as rock or tile, on both the left and right
hand sides of the unit (top and bottom sides do
not allow for an overlap), this overlap must not
be exceeded or the glass door will no longer
open properly.
Non-combustible wall board is installed up
to the fl anges on all sides of the unit. When
installing any additional facing material use
the Finishing Template (included with the unit)
to ensure that the fi nishing material does not
exceed the allowable overlap.
The Finishing Template uses two magnets to
attach itself to the fl ange on the left or right side
of the unit (see diagram below). Install the facing
material up to the outside edge (when facing
the unit) of the fi nishing template. This template
may be discarded after the facing material has
been installed.