Raypak 133-4001 Boiler User Manual


 
39
2
. Lift burners from slotted spacer and slide from ori-
fices. Clean with a wire brush.
3. Clean orifice(s) as necessary.
!47:?#08:A,7,9/70,9492
1. Disconnect pilot tubing at pilot and sensor/igniter
wire. Remove screws holding pilot bracket to burn-
er tray.
2. Remove pilot and bracket, clean pilot of debris,
small bugs, etc., with wire or small brush.
3. Replace pilot, pilot tubing, sensor ignition wires
and check for leaks.
423484?:=%,96>?,?#08:A,7
1. Turn off electrical power.
 % If the heat exchanger is sooted badly, the
b
urner hold-down bracket and spacer can become
distorted from direct flame impingement and this
usually necessitates replacement of these parts.
2. Remove front inspection panel.
3. Remove wires to high limit and loosen screws
holding high limit to cabinet.
4. Remove wedge clip holding sensing bulb in con-
trol well.
5. Remove high limit and install a new one.
6. Check control operation before leaving job.
0,?C.3,920=#08:A,7
1. Shut water, gas and electricity off, close valves
and relieve pressure, remove relief valve. Remove
side inspection panels.
2. Remove top holding screws.
3. Remove draft diverter, lift and remove top and flue
collector on stack type models. Remove inspec-
tion panels.
4. Loosen bolts and disconnect flange nuts on in/out
header, loosen union(s) at gas pipe, and slide boil-
er away from piping until studs clear the heater.
IN/OUT
HEADER
HIGH LIMIT
ELECTRICAL
JUNCTION BOX
REDUNDANT
SAFETY
SHUT-OFF
VALVE
MANUAL GAS VALVE
MAIN GAS VALVE
SEDIMENT TRAP
Fig. 53: Model 2100–4001 Boiler Illustration