Harman VF3000 Boiler User Manual


 
8
The VF3000 is reversible as to which end the
hopper and ue pipe are located. Therefore, a decision
must be made as to which way will work best for your
situation.
If you woud like to have the ue to the right and
the hopper to the left, make sure the gaskets are in place
on both the ue pipe and ue plate. Bolt the ue pipe
on the right end and the ue plate on the left end of the
base. Next, the bafe must be slid into place on the right
end with the center of the base. Note the bafe and ue
pipe must always be at the same end and opposite the
hopper.
Next, place the base jacket around the base and
clamp into place with the four clamping bolts on the
front of the base. The hole in the jacket goes around the
ue pipe.
Place 1/4” x 1” gasket around the at edge on top
of the base. Now place the boiler on top of the base with
the feeder opening opposite the ue pipe. Place 1/4” x 1”
gasket around the door openings on the boiler. Bolt the
door mount on the front door opening with 5/16” x 1”
at head bolts. Bolt the door blank on the rear opening
with 5/16” x 1” hex head bolts.
Now the outer jacket can be installed. The front
jacket with the coil hole must be installed rst. Next,
the two sides which hold the front in place and then the
top which holds the sides in place.
Top
Left Side
Front
Boiler
Cleaning Rod
Spring Handle
Hopper - Sold
separately
Door
Blank
Adapter
Plate
Base Jacket
Base
Ash Tub
Ash Door
Right Side
Bafe
Flue Pipe
Clean out slide
Flue Plate
Hopper
Support
Assembly