4
221834B
Instructions for Use
Boiler Clearances
If fixtures are positioned close to the boiler, space must be left
as shown in diagram 3. Enough space must also be left in front
of the boiler to allow for servicing.
Boilers Installed in a Compartment or
Cupboard
If the boiler is installed in a cupboard or compartment do not
obstruct any ventilation openings.
Do not use the cupboard or compartment for storage.
Regularly make sure that the air vent openings are clear of
obstructions.
Cleaning
WARNING. This appliance contains metal parts (components)
and care should be taken when handling and cleaning, with
particular regard to edges.
Clean the casing occasionally by wiping it over with a damp
soapy cloth or dry polishing duster.
Do not use an abrasive cleaner.
Protection Against Freezing
If the boiler is to be out of use for any long period of time during
severe weather conditions we recommend that the whole of the
system, including the boiler, be drained off to avoid the risk of
freezing up. Make sure that, if fitted, the immersion heater in the
cylinder is switched off.
If you have a sealed water system contact your installation/
servicing company as draining, refilling and pressurising must
be carried out by a competent person.
Boiler Electrical Supply
WARNING. The boiler must be earthed.
The boiler must only be connected to a 240V~50Hz supply,
protected by a 3A fuse.
All wiring must be in accordance with the current issue of
BS7671.
The colours of three core flexible cable are:
Brown - live, Blue - neutral, green and yellow - earth.
As the markings on your plug may not correspond with these
colours, continue as follows:
The wire coloured blue must be connected to the terminal
marked “N” or “Black”.
The wire coloured brown must be connected to the terminal
marked “R” or “Red”.
The wire coloured green and yellow must be connected to the
terminal marked “E”, “Green” or the earth symbol
.
Electrical Supply Failure
Failure of the electrical supply will cause the burner to go out.
Should this happen, operation of the boiler will normally resume
after the electrical supply is restored.
If the burner does not relight after an electrical supply failure the
overheat device may need resetting, press the reset button on
the underside of the boiler, see diagram 2.
PERMANENT
SURFACE
*
5
*
5
55
1
5
0
100
500
*
INCREASE THIS DIMENSION TO
25mm FROM COMBUSTIBLE MATERIAL
CLEARANCE OPPOSITE TO FLUE EXIT
MUST BE ADEQUATE FOR THE
INTERNAL INSTALLATION
5
*
5
Diagram 3