Stovax PR0919 Stove User Manual


 
22
INSTALLATION INSTRUCTIONS
COMMISSIONING
7. COMMISSIONING
7.1 Complete the Commissioning Checklist at the front of this
manual covering:
• Fluechecks
• Gaschecks
• Pebblelayout-flamepicture
For working pressure test, use the access panel at the gas
connection ensuring the burner is in position.
7.2 In the unlikely event that the appliance is receiving
interference from other electronic devices, re-programme
the handset/Control box
Reprogramming handset/Control box
• Removethebatterycoverfromthehandsettoseethe
four DIP switches. See diagram29
29
AR1935
Eachofthefourswitchescanbesettoeitheroneoftwo
positions, in any combination.
Tore-codethehandset
• ChangethecombinationofhowtheDIPswitchesareset.
For example see diagram20
30
AR1936
Oncethehandsethasanewcodethecontrolboxneedsto
be reprogrammed:
To access the control box see Servicing Instructions, Section
7 - Main Control Assembly.
• Pressandholdtheresetbuttononthecontrolboxuntil
you hear two signals. After the second longer signal:
• Releasetheresetbuttonandwithin20
seconds
• PresstheDOWNbuttononthehandsetuntil
you hear an additional long signal
confirming the new code