FMI MM33 Indoor Fireplace User Manual


 
www.fmiproducts.com
125160-01A16
VENTING INSTALLATION
Continued
Nail Only
Outer
Perimeter
of Flashing
Storm
Collar
Flashing
Cone
Underlap Shingles
at Bottom
Overlap Shingles
Top and Sides
Only
Figure 21 - Flashing Installation
FLASHING INSTALLATION (V6F-10DM OR
V12F-10DM)
Determine the ashing to be used with the roof open-
ing chart. Slide ashing over pipe until base is at
against roof. Replace as many shingles as needed
to cover exposed area and ashing base. Secure in
position by nailing through shingles (see Figure 21).
DO NOT NAIL THROUGH FLASHING CONE.
Installing Flashing on a Metal Roof
When installing the ashing on a metal roof, it is re-
quired that putty tape be used between the ashing
and the roof. The ashing must be secured to the
roof using #8 x 3/4" screws and then sealed with roof
coating to prevent leakage through the screw holes.
A roof coating must also be applied around the pe-
rimeter of the ashing to provide a proper seal.
Storm Collar Installation (SC2-1)
Place storm collar over pipe and slide down until it is
snug against the open edge of the ashing (see Figure
22). Apply waterproof caulk around the perimeter of
the collar to provide a proper seal.
Figure 22 - Storm Collar
Chimney
Pipe
Waterproof
Caulk
Storm
Collar
Flashing
TERMINATIONS/SPARK ARRESTOR
The replace system must be terminated with the
listed round top or chase terminations. In any case,
refer to the installation instructions supplied with the
termination.
CAUTION: Do not seal openings on the rooftop
ashing. Follow the installation instructions
provided with the termination being used.
Secure
Termination
to Outer Pipe
with 3 Screws
RTL-12D
Level of
Flue Gas
Outlet
Waterproof
Caulking
Storm
Collar
Flashing
Figure 23 - Termination
Overlap
Shingles (Top
and Sides of
Flashing Base)
CHASE INSTALLATIONS
Instructions for chase installations are included with
the chase style termination chosen. In a multiple
chase installation, be sure to provide adequate dis-
tance between terminations to prevent smoke spill-
age from one termination to another. We suggest
that terminations be separated at least 24", center to
center and stacked at a vertical height difference of
18" (see Figure 24, page 17).
Stainless
Inner Flue
Pipe
Underlap
Shingles