Conair 106 Thermostat User Manual


 
3-14 l Installation
Connecting the RTD Sensors (continued)
3
Route the process setback RTD cable to the control center. Plug the connector
into the lower receptacle in the side of the control center. Hand tighten the con-
nector. Coil any excess cable and secure it with a wire tie.