i. If minimum return water temperature can
be maintained at 135°F and temperature
differential across the system is at 40°F
or less, refer to Figure 26 or 27 for
recommended minimum boiler piping
details.
ii. If minimum return water temperature cannot
be maintained at 135°F or the temperature
differential across the system varies, a blend
pump is recommended as a minimum to help
protect the boiler from ue gas condensation
and/or thermal shock. See piping details in
Figure 28. Primary secondary piping with
a by-pass is an alternate to the blend pump
method and is shown in Figure 29.
d. If conditions exist where the boiler is subjected
to prolonged periods of operating conditions
below 135°F, other mixing methods such as three
or four way valves or variable speed injection
should be used. Burnham Commercial offers an
RTC Return Temperature Control kit to protect
the boiler. See separate RTC manual.
e. Multiple Boilers - Recommended minimum
multiple boiler piping is shown in Figure 30 as
primary secondary with a by-pass. The boiler
circulator will maintain a constant ow through
the boiler during every heat demand while the
by-pass diverts a portion of hot water back to
the return. Alternate minimum multiple boiler
piping is shown in Figure 31. The blend pump
will maintain constant ow through the boiler
during every heat demand and provide a hot
water blend back to the return.
f. Glycol Antifreeze Solutions - Many systems
today use ethylene or propylene glycol antifreeze
solutions as a measure for freeze protection, as
well as a pump lubricator and corrosion inhibitor.
The properties of the glycol mixture have an
impact on valve and pump sizing. All glycol
solutions have a lower specic heat than water.
This means that the glycol solution cannot
transfer heat as well as pure water, resulting in
the need for higher ow rates. In addition, the
viscosity of the glycol solution is usually higher
than water, requiring a higher pump head for the
same given ow. Consult factory for specic
applications, pump selection and ow rate.
WARNING
A properly constructed Hartford Loop must be
installed on all gravity return steam systems.
Hartford Loop is not required on pumped return
systems.
2. STEAM HEATING, consult I=B=R Installation
and Piping Guide No. 200. For piping details,
see Figure 32. Figure 33 shows a typical pumped
return/boiler feed unit arrangement. Figure 34
illustrates the required elevations for McDonnell and
Miller 150 and 63 oat low water cut-offs.