Burnham V9A Boiler User Manual


 
10
SECTION I - GENERAL INFORMATION (Continued)
A. INSPECT SHIPMENT carefully for any signs of
damage.
1. ALL EQUIPMENT is carefully manufactured,
inspected and packed. Our responsibility ceases
upon delivery of crated boiler to the carrier in good
condition.
2. ANY CLAIMS for damage or shortage in shipment
must be led immediately against the carrier by the
consignee. No claims for variances from, or short-
age in orders, will be allowed by the manufacturer
unless presented within sixty (60) days after the
receipt of goods.
B. LOCATE THE UNIT
1. RECOMMENDED SERVICE CLEARANCE
- Locate the unit in the boiler room so as to
provide ease of venting and adequate clearance
for maintenance, serviceability, and installation of
piping. Refer to Figure 1 for boiler dimensional
data.
FRONT — Provide 43” service clearance for
removal, maintenance, and servicing of burner and
controls.
REAR — Provide a minimum clearance from the
boiler jacket for access to ame observation port,
rear ue damper and vent piping, relief valve, and
boiler return piping. See Table III.
LEFT SIDE — Provide a minimum clearance from
the boiler jacket of 26” for cleaning of ueways and
installation and removal of tankless heater(s).
RIGHT SIDE — Provide a minimum clearance from
the boiler jacket of 12”.
TOP — Provide a minimum clearance from the
boiler jacket of 24”
NOTICE
Recommended clearance for service may be
reduced to minimum clearance to combustible
material. However, increased service and
maintenance difculty will result.
WARNING
Boiler is suitable for installation on combustible
oor. Do not install boiler on carpeting.
Floor construction should have adequate load
bearing characteristics to bear the weight of
the boiler lled with water (see Table 1). A
boiler foundation similar to the one shown in
Figure 2 is recommended if the boiler room
oor is weak or uneven or if a water condi-
tion exists.
2. FOR MINIMUM CLEARANCES to combustible
materials, See Table II.
3. PROVIDE ADEQUATE FOUNDATION for the
unit. Refer to Figure 2.
Table II: Minimum Clearances To Combustible
Materials (Inches)
Boilers with Top Flue Outlet
Boilers with Rear Flue Outlet
* See Table III for Recommended Service Clearance to
access rear of boiler
NOTES:
1. Listed clearances comply with American
National Standard ANSI/NFPA 31, Installation of
Oil Burning Equipment.
2. V9A Series boilers can be installed in rooms with
clearances from combustible material as listed
above. Listed clearances cannot be reduced for
alcove or closet installations.
3. For reduced clearances to combustible material,
protection must be provided as described in the
above ANSI/NFPA 31 Standard.
A B C D E
Above Front Rear Sides Vent Connector
6 24 6 6 18
Flue
Outlet
Size
Top
Flue
Outlet
Rear Flue Outlet
Combustible
Surfaces
Non-Combustible
Surfaces
7” Dia. 18” 37” 22”
8” Dia. 38” 23”
10” Dia. 40” 25”
12” Dia. 43” 28”
Table III: Recommended Rear Service Clearance