APC ACPCW40-150 Air Conditioner User Manual


 
InRoom Precision AC Tech Data Manual74
InRoom Guide Specifications
PART 1 GENERAL
1.01 SUMMARY
A. The InRoom environmental control system shall be designed specifically for precision
temperature and humidity control applications. It will automatically monitor and control heating,
cooling, humidifying, dehumidifying, and filtering functions for the conditioned space. The
system shall be built to the highest quality engineering and manufacturing standards, and shall be
floor mounted and configured for ____(up/down) discharge of conditioned airflow, with draw-
through air pattern, to provide uniform air distribution over the entire face of the coil.
1.02 DESIGN REQUIREMENTS
A. The system shall be as described in the following specification as manufactured by APC.
1. Model: ____________________________
2. Total cooling capacity: _______________ kW (MBH)
3. Sensible cooling capacity: _____________ kW (MBH)
4. Return air temperature: _______________ º C (º F) DB
5. Return air temperature: _______________ º C (º F) WB
6. Humidity: __________________________% RH
7. Air quantity: _______________________ L/s (CFM)
8. External Static Pressure: _______________Pa (PSI)
9. Humidifier capacity: _________________ kg/hr (lb/hr)
10.Electrical supply: ________ V, _________ ph, _____ HZ
1.03 SUBMITTALS
A. Submittals shall be provided with the proposal and shall include: capacity data, electrical data,
physical data, electrical connection drawing and piping connection drawing.
1.04 QUALITY ASSURANCE
A. The system shall be completely factory-tested prior to shipment. Testing shall include, but not be
limited to: complete pressure and leak testing to ensure system integrity to include controls
calibration and settings. Each system shall ship with a completed test report to verify completion
of factory testing procedure. The system shall be ETL/CETL, NTRL listed, MCA, and the
electrical system shall be UL Listed to UL 1995 and CSA 22.2 No. 236.
1.05 WARRANTY
A. 1 year parts without factory start-up and 1 year parts and labor with factory start-up.