Toshiba RAV-SM560AT-E Air Conditioner User Manual


 
15
RAV-SM800BT-E
170
12020
70252290
290
1050 ± 7.5 Hanging bolt pitch
1000 Dimension of main unit
150
460~6405
1030
1050 Ceiling opening size
80
60
457 to 637
75
720
210
509
630
300
130 80
30
35
90 120
305
314.5
240
211
45
Refrigerant pipe
connecting port
(Gas side Ø12.7)
80
170
155 to 335
30 320
210
170
100
70
450
150
450
2-Ø200
Discharge port flange
4-M10
Hanging bolt
(Procured locally)
For hanging bolt M10
(4-12 x 25 long hole)
25
25
800 Dimension of main unit
565 Hanging bolt pitch
Drain pipe connecting port
at drain up kit side
(For polyvinyl chloride pipe
(Inner dia. 32, Nominal dia. 25))
Refrigerant pipe
connecting port
(Liquid side Ø6.4)
Ø125 knockout hole (Only rear side)
(For air suction)
6-Ø4 tapping screw lower hole Ø160
Suction port canvas
Suction panel
470 Ceiling opening size
Panel
2-Ø26 power supply remote
controller cord draw-out port
Drain pipe connecting port
at main unit side
(For polyvinyl chloride pipe
(Inner dia. 32, Nominal dia. 25))
Plane view of main unit
Check port A
(Pipe side)
Discharge side
NOTE 1 :
For maintenance of the equipment, be sure to install
a check port A at the position as shown below.
NOTE 2 :
Using the drain up kit sold separately, drain-up by 300 (mm)
from drain pipe draw-out port of the main unit is necessary.
The drain-up over 300mm or more is impossible.
Drain up kit
(Sold separately)