Toshiba RAV-SM1402CT-E Air Conditioner User Manual


 
182
1 -2
2 -2
3 -2
3 -3
Drain pan
Plastics nut
Float switch
Screws
(Fixing drain pump and drain plate)
Screws
(Fixing drain pump and main unit)
Screws
(Fixing drain pan and main unit)
No.
Q
Part name
Drain pan
Procedure
1. Remove the Drain up kit from the main
unit.
2. Remove the set screws (2 positions)
and drain pan.
Remarks
R
S
1. Remove the drain pan.
2. Remove the plastics nut of fixing float
switch.
3. Remove the float switch.
1. Remove the drain pan.
2. Remove the set screws (4 positions) of
fixing drain pump plate and main unit.
3. Remove the screws (3 positions) of
fixing drain pump plate and drain pump.
Float switch
Drain pump
15-3. Replacement of Main Parts (Sold Separately)
15-3-1. Drain up Kit
TCB-DP22CE2