Sierra Monitor Corporation IZS30 SERIES Air Cleaner User Manual


 
4. Installation
4-1. Installation of Ionizer body
Investigate the places where static problem occurs, or process and parts which generate ESD
(Electro static discharge), and carefully consider the required conditions to ensure appropriate
static charge elimination before installation.
Operating distance and static charge elimination time: See [1. installation distance and
static charge elimination time of 6-1.Static charge elimination characteristics
(reference) ].
Static charge elimination area: See [See 2. Static charge elimination area of 6.1 Static
charge elimination characteristics (reference)].
1. Mount end brackets on both sides of the ionizer body with the attached M4 threads.
Recommended tightening torque for M4 thread: 0.75Nm
2. Mount intermediate brackets on the ionizer body at regular interval.
Note No intermediate bracket is attached to IZS30-300B (SB), IZS30-780B (SB)).
A. Tap M5 thread on the brackets mounting positions at the installation side, and fix the ionizer
body and brackets with M5 threads.
ዩዑ
ዑ࠲
ዩዑ
ዑࡀ
End bracket
Attached M4 threads
Intermediate bracket
M5 tap
M5 threads