Regency P121LC Indoor Fireplace User Manual


 
Regency
®
P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace
22
VERTICAL
TERMINATIONS
1) Maintain the 1-1/4" clearances
(air spaces) to combustibles
when passing through ceilings,
walls, roofs, enclosures, attic
rafter, or other nearby combustible
surfaces. Do not pack air spaces
with insulation. Check the "Venting
Arrangement" section for the
maximum vertical rise of the venting
system and the maximum horizontal
offset limitations.
2) Set the gas appliance in
its desired location. Drop a
plumb bob down from the
ceiling to the position of
the appliance fl ue exit, and
mark the location where the
vent will penetrate the ceiling. Drill a small
hole at his point. Next, drop a plumb bob
from the roof to the hole previously drilled
in the ceiling, and mark the spot where
the vent will penetrate the roof. Determine
if ceiling joists,
roof rafters or
other framing
will obstruct the
venting system.
You may wish
to relocate the
appliance or to
offset, as shown
in Diagram 2
to avoid cutting
load bearing
members.
Diagram 3
Diagram 5
Diagram 1
Diagram 2
Note: Apply sealant "Mill-Pac" to inner
pipe and high temperature silicone
sealant to outer pipe on every twist-
lock joint.
3) A Firestop spacer must be installed in the
fl oor or ceiling of every level. To install the
Firestop spacer in a fl at ceiling or wall,
cut a 10 inch square hole. Frame the hole
as shown in Diagram 3 and install the
fi restop.
4) Assemble the desired lengths of pipe and
elbows. Ensure that all pipes and elbow
connections are in the fully twist-locked
position and sealed.
5) Cut a hole in the roof centered on the small
drilled hole placed in the roof in Step 2. The
hole should be of suffi cient size to meet
the minimum requirements for clearance
to combustibles of 1-1/4". Slip the fl ashing
under the shingles (shingles should overlap
half the fl ashing) as per Diagram 4.
Diagram 4: The upper half of the fl ashing is
installed under the roofi ng material and not
nailed down until the chimney is installed.
This allows for small adjustments.
6) Continue to assemble pipe lengths.
Note: If an offset is necessary in the attic
to avoid obstructions, it is important
to support the vent pipe every 3 feet,
to avoid excessive stress on the
elbows, and possible separation.
Wall straps are available for this
purpose (Diagram 2).
Galvanized pipe is desirable above the roofl ine
due to its higher corrosion resistance. Continue
to add pipe sections through the fl ashing until
the height of the vent cap meets the minimum
height requirements specifi ed in Diagram 5 or
Diagram 3
Diagram 4
Diagram 5
7) Before connecting the horizontal run of vent
pipe to the vent termination, slide the Wall
Thimble (Part # 942) over the vent pipe.
8) Slide the appliance and vent assembly
towards the wall carefully inserting the
vent pipe into the vent cap assembly. It is
important that the vent pipe extends into
the vent cap suffi cient distance so as to
result in a minimum pipe overlap of 1-1/4
inches. Secure the connection between the
vent pipe and the vent cap by attaching the
two sheet metal strips extending from the
vent cap assembly into the outer wall of the
vent pipe. Use the two sheet metal screws
provided to connect the strips to the pipe
section. See Diagram 4.
9) Install wall thimble in the center of the
10" square and attach with wood screws
(Diagram 5).
INSTALLATION
Roof Pitch Minimum Vent Height
Feet Meters
fl at to 7/12 2 0.61
over 7/12 to 8/12 2 0.61
over 8/12 to 9/12 2 0.61
over 9/12 to 10/12 2.5 0.76
over 10/12 to 11/12 3.25 0.99
over 11/12 to 12/12 4 1.22
over 12/12 to 14/12 5 1.52
over 14/12 to 16/12 6 1.83
over 16/12 to 18/12 7 2.13
over 18/12 to 20/12 7.5 2.29
over 20/12 to 21/12 8 2.44