TABLE OF CONTENTS
PAGE
NO.
4 SECTION A: BEFORE INSTALLING THE BOILER
8 SECTION B: BOILER INSTALLATION
11 SECTION C: COMBUSTION AND VENTILATION AIR
13 SECTION D: WATER PIPING - GENERAL
14 SECTION E: HYDRONIC HEATING PIPING
16 SECTION F: DOMESTIC HOT WATER PIPING
17 SECTION G: POOL HEATING
19 SECTION H: GAS SUPPLY CONNECTIONS
21 SECTION I: ELECTRICAL POWER CONNECTIONS
24 SECTION J: VENTING CONNECTIONS
28 J-1: Natural Draft Vertical Venting
31 J-2: Horizontal Thru-Wall Venting
34 J-3: Horizontal Thru-Wall Direct Venting
36 J-4: Vertical Direct Venting/Combustion Air
38 J-5: Outdoor Installation
43 SECTION K: CONTROLS
49 WIRING DIAGRAMS
53 SECTION L: GENERAL SAFETY PRECAUTIONS
54 SECTION M: PRE-START-UP
55 SECTION N: HI-DELTA INITIAL START-UP
59 SECTION O: POST START-UP CHECK
60 SECTION P: OPERATION
61 SECTION Q: MAINTENANCE
63 APPENDIX A: COMBUSTION AIR CONTAMINATION
64 WARRANTY