2
926.772.1 - GB/IEINSTRUCTIONS PERTAINING TO THE USER
Dear Customer,
We are sure your new boiler will comply with all your requirements.
Do not dispose of this booklet as it contains the information, which will help you to run your
boiler correctly and efciently.
POTTERTON GOLD HIGH OUTPUT boilers bear the CE mark in compliance with the
basic requirements as laid down in the following Directives:
- Gas Directive 2009/142/CE
- Performance Directive 92/42/CEE
- Electromagnetic Compatibility Directive 2004/108/CE
- Low Voltage Directive 2006/95/CE
Do not leave any parts of the packaging (plastic bags, polystyrene, etc.) within children’s reach as they are a
potential source of danger.
1. Instructions prior to installation 3
2. Instructions prior to commissioning 3
3. Commissioning of the boiler 4
4. Filling the boiler 10
5. Turning off the boiler 10
6. Prolonged standstill of the system. Frost protection 10
7. Servicing instructions 10
8. General information 11
9. Instructions prior to installation 11
10. Boiler installation 12
11. Boiler size 13
12. Installation of ue and air ducts 13
13. Hydraulic system 16
14. Connecting the mains supply 20
15. Gas valve adjustment 27
16. Setting the boiler parameters 29
17. Control and operation devices 30
18. Positioning of the ignition and ame sensing electrode 31
19. Check of combustion parameters 31
20. Activating the chimney-sweep function 32
21. Annual service 32
22. Boiler schematic 33
23. Illustrated wiring diagram 34
24. Technical data 35
CONTENTS
INSTRUCTIONS PERTAINING TO THE USER
INSTRUCTIONS PERTAINING TO THE INSTALLER