Market Forge Industries Gas Operated Boiler Boiler User Manual


 
5
OPERATING INSTRUCTIONS
MODELS:
M24G100A - 4SP
M24G200A - 4SP
M36G100A - 4SP
M36G200A - 4SP
M36G300A - 4SP
Control Panel
OPERATING INSTRUCTIONS
STEAM GENERATORS
FIRST CHECK TO BE SURE THAT:
A. WATER SWITCH IS IN THE OFF POSITION.
B. WATER SUPPLY VALVE IS OPEN.
C. ELECTRICITY IS CONNECTED TO ALL UNITS.
D. THAT THE GAS IS TURNED ON. (GAS OPERATED UNITS ONLY)
E. THEN PROCEED WITH DAILY OPERATING PROCEDURES.
DAILY OPERATING PROCEDURE
STEP 1 PRESS WATER SWITCH FROM OFF TO ON.
STEP 2 WAIT 5-10 MINUTES FOR WATER TO FILL IN STEAM GENERATOR
(GAUGE GLASS SHOULD BE 2/3 FULL.)
STEP 3 PRESS HEAT SWITCH FROM ON TO OFF AND RELEASE BACK TO ON
WHEN THE LOW WATER LIGHT GOES OFF. GREEN INDICATOR LIGHT
WILL COME ON. (THIS IS NECESSARY TO MANUALLY RESET THE UNIT.)
DAILY SHUT DOWN AND CLEANING
STEP 1 PRESS WATER SWITCH OFF. THIS WILL DRAIN THE STEAM GENERATOR.
STEP 2 AFTER STEAM GENERATOR HAS COMPLETELY DRAINED REPEAT
STEAPS 1 & 2 OF DAILY OPERATING PROCEDURE.
(WATER TO REMAIN IN STEAM GENERATOR UNTIL NEXT DAILY USE.)