Market Forge Industries Gas Operated Boiler Boiler User Manual


 
23
APPLICATION INSTRUCTIONS
S-2299
APPLICATION INSTRUCTIONS FOR TOTAL CONCEPT CLEANING OF BOILER
SIZE: 1 Gallon PART NUMBER: 20 - 0307
Fig. 5
4. Remove the shipping cap, replace it with the pouring
cap. Cut the tip of the pouring cap at the rst notch to
a 45
o
angle.
5. Install the tubing rmly over the tip of the pouring
cap.
Fig. 6
6. Energize compartment to release steam pressure in
boiler to “0” PSI before removing pipe plug.
7. Remove the plug from the access port on the steam
header pipe inside cabinet doors.
CAUTION: HE7DER PIPE & ACCESS PLUG ARE HOT.
Fig. 7
Fig. 8
8. Feed the tubing through the access port in the boiler
compartment.
NOTE: A minimum of 12” must be inserted.
Fig. 9
Tilt the container, pour the contents into the unit.
When empty, rell the container with hot tap water
and add to boiler for cleaning. Repeat twice. This
additional 2 gallons of water will cause the low water
probe to be immersed in cleaner/descaler solution.
Replace access plug.
After rinsing the container, place tubing inside the
bottle, cover with shipping cap, dispose of properly.
DO NOT REUSE CONTAINER.
DO NOT ENERGIZE HEATERS. Allow 2 hours for
cleaning.
After time has elapsed, drain the boiler.
Rell the boiler and drain. Repeat this step twice.
Bring the boiler to temperature and cycle steam to
the cooker compartment to purge cleaner/descaler
from the steam supply lines. Repeat this step twice.
Boiler is now ready for use.
9.
10.
11.
12.
13.
14.
15.
16.