Lochinvar 400-801 Boiler User Manual


 
49
Maintenance and annual startup
Table 9A Service and Maintenance Schedules
Owner maintenance
(see the Outdoor Knight XL User’s Information
Manual for instructions)
Daily
• Check boiler area
Check pressure/temperature
gauge
Monthly
Check air and vent termination
screens
• Check relief valve
• Check condensate drain system
Periodically
• Test low water cutoff (if used)
• Reset button (low water cutoff)
Every
6 months
Check boiler piping (gas and
water) for leaks
• Operate relief valve
End
of season
months
Shut boiler down (unless boiler
used for domestic hot water)
9 Maintenance
Service technician
(see the following pages for instructions)
General:
• Address reported problems
• Inspect interior; clean and vacuum if
necessary;
• Clean condensate trap and ll with fresh
water
Check for leaks (water, gas, ue,
condensate)
Verify ue and air passage ways in good
condition and sealed tight
Check system water pressure/system
piping/expansion tank
• Check control settings
Check ignition and flame sense
electrodes (sand off any deposits; clean
and reposition)
• Check wiring and connections
Perform start-up checkout and performance
veri cation per Section 7.
• Flame inspection (stable, uniform)
• Flame signal (at least 10 microamps at
high re)
Clean the heat exchanger if ue temperature
is more than 54°F (30°C) above return water
temperature.
If combustion or performance
indicate need:
• Clean heat exchanger
Remove and clean burner using
compressed air only
• Clean the blower wheel
ANNUAL START-UP
Outdoor Knight XL Installation & Operation Manual