Lochinvar 3.5 Boiler User Manual


 
1 Service (continued)
Service Manual
29
The third screen is the “Runtime History”. There are several pieces of information that are displayed on this screen. Items that can
be viewed on this screen are as follows:
Power hours – Shows the number of hours the control has been powered on since the last reset.
Running hours – Shows the number of hours that the boiler has been fi ring since the last reset.
Ignition attempts – Shows the number of times the control has attempted to ignite since the last reset.
Successful Ignition attempts - Shows the number of times the control has successfully ignited since the
last reset.
Total Power hours – Show the total number of hours the control has been powered.
Total Running hours – Show the total number of hours that the boiler has been fi ring.
Total ignition attempts – Show the total number of times the control has attempted to ignite.
Total Successful ignition attempts – Show the total number of times the control has successfully ignited.
The top left of this screen details the running hours based on 4 different running positions.
History Screen
Figure 1-13 History Screen_Runtime History