Cut hole 1/8 in. (3 mm) greater
in size than pattern of support
box as it is projected onto
roofline.
2 in. (51 mm)
minimum below
finished ceiling
Cathedral ceiling
support box
Level
F. Install Decorative Ceiling Components
(SLP only)
A decorative ceiling thimble can be installed on a at ceil-
ing through which the vent passes. The ceiling thimble is
used to cover the restop, which is installed according to
section 8.C.
Seal the gap between the vent pipe and restop using
high temperature silicone (300º F minimum continuous
exposure rating) to prevent cold air in ltration.
Install the decorative ceiling thimble by sliding it up to
the ceiling and attaching it using the provided screws.
A decorative cathedral ceiling support box can be used
where vertical vent runs pass through a cathedral ceiling.
Use a plumb-bob to mark the center line of the venting
system on the ceiling and drill a small hole through the
ceiling and roof at this point. Locate the hole and mark
the outline of the cathedral ceiling support box on the
outside roof.
Remove shingles or other roof covering as necessary
to cut the rectangular hole for the support box. Cut the
hole 1/8 in. (3 mm) larger than the support box outline.
Lower the support box through the hole in the roof until its
bottom is at least 2 in. (51 mm) below the ceiling (Figure
10.12).
Level the support box both vertically and horizontally
and temporarily tack it in place through the inside walls
into the roof sheathing.
Use tin snips to cut the support box from the top corners
down to the roof line and fold the resulting aps to the
roof. See Figure 10.13.
• Nail the aps to the roof AFTER running a bead of non
hardening sealant between the aps and the roof.
WARNING! Risk of Fire! Clean out ALL materials from
inside the support box and complete the vertical vent run
and termination.