Desa (V)T32N SERIES Indoor Fireplace User Manual


 
www.desatech.com
111986-01D 5
Figure 2 - Common Fireplace Locations
Flush with a wall
Through exterior wall
enclosed in a chase
Corner
installation
This replace does not require electricity to
operate.
Only the blower requires electricity if installed
and if you plan to install the blower at a later
date, do not forget to wire the outlet at the bot-
tom of the replace when framing.
A piezo ignitor and ceramic electrode create
spark to ignite the pilot light. It does not require
any matches, batteries or any other sources of
ignition to light the pilot.
Each time you turn on your replace, you may
notice some amount of condensation on the
inside of the replace glass. This is normal and
will disappear after 10-20 minutes of opera-
tion.
Your direct-vent gas replace system (replace
and venting) is a balanced and sealed gas op-
erating unit. It requires approximately 10-20
minutes of operating time before the ame
pattern stabilizes.
PRE-INSTALLATION
PREPARATION
LOCATION AND SPACE
REQUIREMENTS
Determine the safest and most efcient location
for your DESA direct-vent replace. Make sure
that rafters and wall studs are not in the way of the
venting system. Choose a location where the heat
output is not affected by drafts, air conditioning
ducts, windows or doors. Figure 2 shows some
common locations. Be aware of all restrictions and
precautions before deciding the exact location for
your replace and termination cap.
When deciding the location of your replace,
follow these rules:
Do not connect this replace venting to a chim-
ney ue serving a separate solid-fuel burning
replace or appliance.
Due to high temperatures, do not locate this
replace in high trafc areas, windy or drafty
areas or near furniture or draperies.
Proper clearances must be maintained.
If your replace is to be installed directly on
carpeting, vinyl tile or any combustible mate-
rial other than wood, it must be installed on a
metal or wood panel extending the full width
and depth of the replace. See Figure 3.
Your replace is designed to be used in zero clear-
ance installations. Wall or framing material can be
placed directly against any exterior surface on the
back, sides or top of your replace, except where
standoff spacers are integrally attached. If standoff
spacers are attached to your replace, these spac-
ers can be placed directly against wall or framing
material. See framing details on page 6.
If you plan on installing a television or enter-
tainment center recessed above your replace, it
is recommended that you maintain a minimum
18" above top of louver opening.
When locating termination cap, it is important
to observe the minimum clearances shown in
Figure 7, page 7.
If recessing into a wall, you can avoid extra
framing by positioning your replace against
an already existing framing member.
Do not recess termination cap into a wall or
siding.
You may paint the termination cap with 450º F
(232º C) heat-resistant paint to coordinate with
the exterior nish.
There must not be any obstruction such as bushes,
garden sheds, fences, decks or utility buildings
within 24" from the front of the termination cap.
Do not locate termination cap where excessive
snow or ice build up may occur. Be sure to
clear vent termination area after snow falls to
prevent accidental blockage of venting system.
When using snow blowers, do not direct snow
towards vent termination area.
Figure 3 - Fireplace Bottom Dimensions
D
RW
FW
34
3
/
8
"
22
1
/
2
"
16
5
/
8
"
PRODUCT FEATURES
Continued