www.desatech.com
111986-01D 25
-
This brick liner kit is optional. You may purchase
brick liner from your local retailer or see Acces-
sories, page 36.
CAUTION: Always handle
1. Remove top and bottom louvers to allow ac-
cess to door latches.
2. Remove screen, unlock door latches and open
glass door. See Removing/Replacing Glass
Door, steps 1 and 2, page 24.
3. If installing brick liner in new replace, go to
step 4. If installing brick liner in an existing
replace, carefully remove logs, lava rock,
and ember material.
4. Remove three screws from deector shield on
the inside top of rebox. Set shield and screws
aside.
5. Install rear brick panel rst. Rest bottom edge of
panel on back edge of grate (see Figure 42).
6. Install left side brick panel by sliding it between
grate and side of rebox (see Figure 43).
FIREPLACE
INSTALLATION
Continued
Figure 42 - Installing Rear Brick Panel
Rear Brick
Panel
Figure 43 - Installing Side Brick Panels
Left Side
Brick Panel
7. Install the right brick panel using the same
method described
8. Replace deector shield using screws removed
in step 4.
9. Install logs, lava rock, and ember material
see Installing Logs, Lava Rock and Glowing
Embers.
10. Close glass door, lock latches on top and bottom
of door and replace screen (see Removing/Re-
placing Glass Door, steps 5 and 6, page 24).
11. Close top and bottom louvers.
Each log is marked with a number. These numbers
will help you identify the log when installing. It
is very important to install these logs exactly as
instructed. Do not modify logs. Only use logs
supplied with replace.
Open louvers, remove screen, unlock door latches,
and open glass door. See Removing/Replacing
Glass Door, steps 1 and 2, page 24. Install logs
according to instructions for fireplace model
numbers.
1. Place log #1 (rear log) on top of grate. Make
sure notches in bottom of log t over grate
(see Figure 44, page 26).
2. Rest log #2 (front log) on pins on front part of
grate (see Figure 45, page 26).
3. Place log #3 (crossover log) onto rear and front
logs. Make sure it is seated properly on smooth
surface of front log and pin on back log as shown
in Figure 46, page 26.
4. Place log #4 (right log) onto pin on right side
of front log as shown in Figure 47, page 26.
5. Place log #5 (base log) onto front left part of
grate making sure notches t over prongs of
grate. See Figure 48, page 26.