www.desatech.com
111986-01D20
11. Peel off backing paper and stick supplied
wiring diagram decal on rebox bottom ap-
proximately 12" in front of blower (see Figure
27, page 19).
-
FIREPLACE
INSTALLATION
Continued
Figure 29 - Blower Wiring Diagram for
Thermostat-Controlled Models
Blue
Variable
Fan Switch
Fan Switch
(N.O.)
Green
White
On
110/115
V.A.C.
Blower
Motor
Black
Off
1
2
Black
INSTALLING GAS PIPING TO
FIREPLACE LOCATION
WARNING: For natural
Installation Items Needed
Before installing replace, make sure you have the
items listed below.
• external regulator (supplied by installer)
• piping (check local codes)
• sealant (resistant to propane/LP gas)
• equipment shutoff valve *
• test gauge connection *
• sediment trap
• tee joint
• pipe wrench
• approved exible gas line with gas connector
(if allowed by local codes)
* A CSA design-certied equipment shutoff valve
with 1/8" NPT tap is an acceptable alternative to test
gauge connection. Purchase the CSA design-certi-
ed equipment shutoff valve from your retailer.
For propane/LP connection only, the installer must
supply an external regulator. The external regula-
tor will reduce incoming gas pressure. You must
reduce incoming gas pressure to between 11" and
14" of water. If you do not reduce incoming gas
pressure, replace regulator damage could occur.
Install external regulator with the vent pointing
down as shown in Figure 30. Pointing the vent
down protects it from freezing rain or sleet.
CAUTION: Use only new,
-
-
Figure 30 - External Regulator with Vent
Pointing Down (Propane/LP Only)
Propane/LP
Supply Tank
External
Regulator
Vent
Pointing
Down