Vermont Casting 20DVT Indoor Fireplace User Manual


 
10009459 15
Brookhaven Direct Vent Gas Fireplace
1
2
3
4
1
2
3
4
1 + 2 + 3 + 4 = 270°
FP1179
Fig. 24 Maximum elbow usage.
FP1029
attic insulation shield
firestop spacers
1/28/00 djt
Joist
Attic Insulation Shield
Ceiling Installation
Upper Floor
11”
(279mm)
Firestop
Spacer
Nails (4)
Fig. 26 Place firestop spacer(s) and secure.
FP1029
11”
(279mm)
FP1184
Typical roof/ceiling
support apps.
Typical Roof
Support
Application
Typical Ceiling
Support
Application
Fig. 25 Venting supports.
FP1184
Min.
2' (610 mm)
FP1185
Fig. 27 Minimum termination to roof clearance.
TWL101a
Twist Lock Pipe
2/8/99 djt
3 #5 Sheet Metal
Screws per Joint
Sealant
TWL101a
Fig. 28 Roof flashing.
Storm Collar
4. Proceed to plumb for additional openings through the
roof. In all cases, the opening must provide a mini-
mum of 1” (25 mm) clearance to the vent pipe, i.e.,
the hole must be at least 9³⁄₈” x 9³⁄₈” (240 x 240 mm).
5. Place fireplace into position.
6. Place firestop(s) #7DVFS or Attic Insulation Shield
#7DVAIS into position and secure. (Fig. 26)
7. Install roof support (Fig. 25) and roof flashing making
sure upper flange is below the shingles. (Fig. 28)
8. Install appropriate pipe sections until the venting is
above the flashing. (Fig. 28)
9. Install storm collar and seal around the pipe.
10. Add additional vent lengths for proper height. (Fig.
28)
11. Apply high temperature sealant to 4” and 7” collars
of vertical vent termination and install.
If there is a room above ceiling level, fire stop spacer
must be installed on both the bottom ad the top side
of the ceiling joists. If an attic is above ceiling level a
7DVAIS (Attic Insulation Shield) must be installed.
The enlarged ends of the vent section always face
downward.