Wayne-Dalton 9600 Garage Door Opener User Manual


 
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer,
refer to your local yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com
Counterbalance lift cable
Short stem track roller
#1 Single
graduated end
hinge (Hinge tube)
Bottom corner bracket
warning label
Milford pin
Cable loop
Bottom weather seal
Bottom corner
bracket
Bottom
section
Short stem track roller
Double graduated
end hinge (Hinge
tube)
Long stem
track roller
Bottom Section
Tools: Level, Wooden shims (if necessary)
5
Center the bottom section in the door opening. Level the section using wooden shims (if
necessary) under the bottom section.
Weather seal
Level
Bottom section
Wooden shims
(If necessary)
Vertical Tracks
Tools: Power Drill, 3/16” Drill bit, 7/16” Socket driver, Tape measure,
Level, Step ladder
6
IMPORTANT: IF YOUR DOOR IS TO BE INSTALLED PRIOR TO A FINISHING CONSTRUCTION
OF THE BUILDING’S FLOOR, THE VERTICAL TRACKS AND THE DOOR BOTTOM SECTION
ASSEMBLY SHOULD BE INSTALLED SUCH THAT WHEN THE FLOOR IS CONSTRUCTED, NO
DOOR OR TRACK PARTS ARE TRAPPED IN THE FLOOR CONSTRUCTION.
IMPORTANT: THE TOPS OF THE VERTICAL TRACKS MUST BE LEVEL FROM SIDE TO SIDE.
IF THE BOTTOM SECTION WAS SHIMMED TO LEVEL IT, THE VERTICAL TRACK ON THE
SHIMMED SIDE MUST BE RAISED THE HEIGHT OF THE SHIM.
Position the left hand vertical track assembly over the track rollers of the bottom section.
Make sure the counterbalance lift cable is located between the track rollers and the door
jamb. Drill 3/16” pilot holes into the door jamb for the lag screws.
Loosely fasten jamb brackets and flag angle to the jamb using 5/16” x 2” lag screws, as
shown.
Tighten lag screws, securing the bottom jamb bracket/bottom slot to jamb, maintain 3/8” to
5/8” spacing, between the bottom section and vertical track. Hang counterbalance lift cable
over flag angle. Repeat same process for other side.
2” Vertical track
spacing (3/8” to 5/8”)
Bottom
section
Floor
Track roller
Jamb
bracket
Flag angle
Flag angle lag screw
locations
5/16” x 2”
Lag screws
Bottom
section
Track
rollers
Vertical track
assembly
Stacking Sections
Tools: Power drill,7/16” Socket driver
7
NOTE: The sections can be identified by the graduation of the factory installed end hinges.
The smallest graduated end hinge on section should be stacked on top of the bottom section,
with each graduated end hinge increasing as the sections are stacked, see Parts Breakdown
on page 2.
NOTE: Make sure graduated end and center hinges are flipped down, when stacking another
section on top.
NOTE: Larger doors will use long stem track rollers with double graduated end hinges.
Place track rollers into graduated end hinges of remaining sections.
With assistance, lift second section and guide the track rollers into the vertical tracks. Lower
section until it is seated against bottom section. Align vertical marks in the upper alignment
sticker, with the lower alignment sticker on right hand side, on the back of door. Keep sec-
tions aligned and fasten center hinge(s) first; then end hinges last using 1/4”-14 x 5/8” self
tapping screws.
NOTE: To prevent center hinge leaf(s) from rotating, first secure the top middle hole of the
center hinge leaf with one 1/4” – 14 x 5/8” self-tapping screw then secure the other two
holes.
NOTE: Larger doors with double graduated end hinges, fasten both hinges to connect the
sections using 1/4” - 14 x 5/8” self-tapping screws.
Repeat same process for other sections, except top section.
IMPORTANT: PUSH & HOLD THE HINGE LEAFS SECURELY AGAINST THE SECTIONS WHILE
SECURING WITH 1/4”-14 X 5/8” SELF TAPPING SCREWS. THERE SHOULD BE NO GAP
BETWEEN THE HINGE LEAFS AND THE SECTIONS.
Lock section
Vertical
tracks
Center
hinge(s)
Left graduated end hinge
with short stem track roller
Left double graduated
end hinge with long
stem track roller
Right graduated end hinge
with short stem track roller
Right double graduated
end hinge with long
stem track roller
1/4”-14 x 5/8” Self tapping screw locations
Secure top
middle
hole first
7