Wayne-Dalton 6100 Door User Manual


 
14
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com
Tools Needed:
Tools Needed:
(1) 3/8” - 16 X 3/4”
Truss head bolt
(1) 3/8” - 16
Hex nut
Flagangle
Horizontal angle
Attaching Horizontal Track to
Adjustable Flagangles
To install horizontal track, place the curved end over
the top roller. Align the bottom of the horizontal track
with the vertical track. Hand tighten the horizontal
track to the flagangle with (2) 1/4”-20 x 9/16” track
bolts and (2) 1/4”-20 flange hex nuts.
DO NOT RAISE DOOR UNTIL HORIZONTAL TRACKS
ARE SE CURED AT REAR, AS OUTLINED IN STEP 20,
OR DOOR COULD FALL FROM OVERHEAD POSI TION
CAUSING SEVERE OR FATAL INJURY.
Level the horizontal track assembly and bolt the
horizontal angle to the slot in the flagangle using (1)
3/8”-16 x 3/4” truss head bolt and (1) 3/8”-16 hex
nut. Repeat for other side.
Remove the nail that was temporarily holding the top
section in place, installed in Step 10.
IMPORTANT: FAILURE TO REMOVE NAIL BEFORE
ATTEMPTING TO RAISE DOOR COULD CAUSE
PERMANENT DAMAGE TO TOP SECTION.
9/16” Socket
Ratchet Wrench
9/16” Wrench
Level
7/16” Socket
Step Ladder
WARNING
11
(2) 1/4” - 20
Flange hex
nuts
(2) 1/4” - 20 X 9/16”
Track bolts
Horizontal
track
Flagangle
With horizontal tracks installed, you can now adjust
the top brackets. Vertically align the top section of the
door with the lower sections. Once aligned, position
the top bracket slide, out against the horizontal track.
Maintaining the slide’s position, tighten the (2) 1/4”-
20 flange hex nuts to secure the top roller slide to the
top bracket base.
Adjusting Top Brackets
Horizontal
track
Top
bracket
slide
(2) 1/4”- 20
Flange hex nuts
Correct
Incorrect
Top
roller
Top section
Top
section
7/16” Wrench
Step Ladder
12
Top
section