Toshiba RAV-SM1403AT-E1 Air Conditioner User Manual


 
– 88 –
Pulse Modulating
Valve (PMV) coil
No. Part name Procedure Remarks
j
k
PMV main unit
Positioning
projection
PMV coil
Dent part
Dent part
Dent part
1. Detachment
1) Perform works of items 1 of c and e.
2) Remove the coil from PMV body while
pulling it upward.
2. Attachment
1) Match the positioning extrusion of the coil
surely to the concavity of PMV body to fix
it.
1. Detachment
1) Perform works of items of 1 of c and 3) of
f.
2) Remove the reactor lead wire from the cord
clamp which fixes lead wires.
3) Remove screw which fixes the reactor.
Partition plate side: M4 x 8, 1 pc.
Inverter rear side: M4 x 8, 2 pcs.
4) Pull off the reactor upward to remove the
reactor.
CAUTION
As the reactor body becomes high temperature
in this Model, the lead wires are fixed with the
cord clamp so that the reactor lead does not
come to contact with the main body. When
replacing the reactor or returning the inverter
assembly to the original position after removing
it, be sure to fix the lead wires with the cord
clamp so that the main body does not come to
contact to the lead.
Reactor
Cord clamp
Screw
Do not pull the lead wire
strongly too much.
Cord clamp Screw
Bind the lead wires with bundling band.