4. Turn the dryer operation switch to the desired position. If you have a seven day timer
installed, set it to “On with timer” position, otherwise set it to “On without timer” position. The
blower will start. An explanation is given in the following diagram.
5. Turn the hopper heater switch to position “I”
Position “O”
Position “I”
On with timer
On without
timer
OFF