Sterling STT70 Dehumidifier User Manual


 
STT40 / STT70
Transporting, Assembly and Storage 7-2
7.1. Transporting and Packing
Please ensure that the lifting equipment has an adequate carrying
capacity.
Note that the dryer system is top-heavy. Risk of toppling!
) The machine must not be tilted or laid on its side.
The equipment has undergone a rigorous operating test in the factory and is packed carefully to
avoid transport damage.
Please check packing materials upon delivery for transport damage.
The inlet and discharge flanges are sealed with plugs so that no dirt can enter during transport.
Remove the plugs before assembly.
Packing materials should be disposed of according to environmental laws or reused.
The dryer or the compact unit is delivered on a pallet.
The dryer should only be moved by means of the appropriate lifting equipment (e. g. a fork lift
truck or a workshop crane).
Fasten the transport cables to the eyelets of the control cabinets.
When transporting the dryer to another location, it must be shock-proofed and free from
vibrations.