Roberts Gorden BH Series Gas Heater User Manual


 
ROBERTS GORDON
®
BH-SER I ES SUBMITTAL SHEET
© 2004 Roberts-Gordon
BEFORE IN STALLATION AND OPERATION OF HEATING EQUIPMENT, READ AND U NDERSTAND THE INSTALLATION, OPERATION AND SERVICE MANUAL.
APPLICATION S, ENGINEERING AND DETAI LED GUID ANCE ON SYSTEMS DE SIGN, INSTALLATION AND PRODUCT PERFORMANCE IS AVAI LABLE UPON REQUEST. ROBERTS GORDON
®
PRODUCTS ARE TO BE
INSTALLED ONLY IN ACCORDANCE WI TH L OCAL LAWS, CODES AND REGULATIONS, AND ONLY BY A CONTRACTOR QUALIFIED I N THE INST ALLAT ION AND SERVICE OF GAS-FIRED HEATING EQUIPMENT.
Tube Clamp Package Installation
Coupling and Tube Assembly
F
l
a
t
W
a
s
h
e
r
Nut
(Tor
que
120 in/lb
13.56
Nm)
Tube
Clamp
B
o
l
t
Description Part Number
Tube Clamp Package 01318901
Tube Clamp 01396801
Bolt 97113940
Flat Washer 95211600
Nut 92113900
Tube
Tube
Orient coupling so that
the impact block is in the
2:00 or 10:00 oclock
positions
Closed
Open
Tab
3" (8 cm) to
4" (10 cm)
Slide Bar/Coupling Lock
Coupling
Wide end
Coupling
Tube
Slide Bar/Coupling Lock
A
Close coupling
with tab
B
Start Slide bar/Coupling Lock
onto coupling
C
Insert tubes into coupling
D
Tighten coupling to join tubes
Descr iption Part Number
Coupling 01329600
Slide bar/Coupling Lock 01329700
Tube 91409XXX