Roberts Gorden BH Series Gas Heater User Manual


 
ROBERTS GORDON
®
BH-SER I ES SUBMITTAL SHEET
© 2004 Roberts-Gordon
BEFORE IN STALLATION AND OPERATION OF HEATING EQUIPMENT, READ AND U NDERSTAND THE INSTALLATION, OPERATION AND SERVICE MANUAL.
APPLICATION S, ENGINEERING AND DETAI LED GUID ANCE ON SYSTEMS DE SIGN, INSTALLATION AND PRODUCT PERFORMANCE IS AVAI LABLE UPON REQUEST. ROBERTS GORDON
®
PRODUCTS ARE TO BE
INSTALLED ONLY IN ACCORDANCE WI TH L OCAL LAWS, CODES AND REGULATIONS, AND ONLY BY A CONTRACTOR QUALIFIED I N THE INST ALLAT ION AND SERVICE OF GAS-FIRED HEATING EQUIPMENT.
BH-Series Linear Layout Overview (Continued)
Burner Tube Installation
BH-175
BH-200
BH-140
BH-150
BH-175
BH-200
BH-200
g
c
b
de
f
e e e e
g
c
b
de
f
e e e e e
g
c
b
de
f
e e e e e e
60' Tube Length
70' Tube Length
80' Tube Length
Weld Seam
must be to the
bottom of the tube.
S Hook
Burner Tube
Hanger
NOTE:
Tubing requires a downward
slope of 1/2" (13 mm)
per 20' (6 m) away
from burner.
7' 6" ± 1'
(229 cm ± 25cm)
Offset mounting
hole must be
to the top
Description Par t Number
Burner Tube 03051XXX
S-Hook 91907302
Tube/Ref lector Hanger 03090100