Heat & Glo LifeStyle PALOMA-BZ-MOD Indoor Fireplace User Manual


 
Heat & Glo • PALOMA-BZ-MOD, PALOMA-GR-MOD, PALOMA-GY-MOD • 2189-900 Rev. i • 5/1218
CEILING FIRESTOP
NAILS
MINIMUM 1 in. (25 mm)
CLEARANCE
MINIMUM 1 in.(25 mm)
CLEARANCE
MINIMUM 1 in.(25 mm)
CLEARANCE
MINIMUM 1 in.(25 mm)
CLEARANCE
Figure 5.16
9. Twist-lock the vent cap and seal.
Note: For multi-story vertical installations, a ceiling firestop
is required at the second floor, and any subsequent floors
(Figure 5.16). The opening should be framed to 10 in. x 10 in.
(254 mm x 254 mm) inside dimensions, in the same manner
as shown in Figure 5.13.
Fire Risk.
Explosion Risk.
Any occupied areas above the first floor,
including closets and storage spaces, which
the vertical vent passed through must be
enclosed. The enclosure may be framed
and sheetrocked with standard construction
materials; however, refer to these installation
instructions for the minimum allowable
clearance between the outside of the vent
pipe and the combustible surfaces of the
enclosure. Do not fill any of the required air
space with insulation.
WARNING
120º
Figure 10.8 Securing Vertical Pipe Sections
120º
Figure 10.9 Securing Horizontal Pipe Sections
H. Secure the Vent Sections
• Vertical runs of SLP pipe must be supported every 8 ft.
(2.44 m).
• Horizontal sections must be supported every 5 feet
(1.52 m).
Vent supports or plumbers strap (spaced 120º apart)
may be used to support vent sections. See Figures 10.8
and 10.9.
• Wall shield restops may be used to provide horizontal
support to vent sections.
• SLP ceiling restops have tabs that may be used to
provide vertical support.
WARNING! Risk of Fire, Explosion or Asphyxiation!
Improper support may allow vent to sag and separate.
Use vent run supports and connect vent sections per in-
stallation instructions. DO NOT allow vent to sag below
connection point to appliance.