Heat Controller R-410A Heat Pump User Manual


 
Specifications & illustrations subject to change without notice or incurring obligations.
Jackson, MI | Printed in U.S.A. (12/12)
INSTALLATION / PERFORMANCE CHECK LIST
REFRIGERATION SYSTEM
Was unit given 24 hr warm up period
for crankcase heaters (if applicable)?
YES NO
Stage-1 Liquid Pressure (high side) ________________________
Stage-1 Suction Pressure (low side) ________________________
7095230 (NEW)
INSTALLER:PLEASELEAVETHESE
INSTRUCTIONS WITH THE OWNER.
INSTALLATION ADDRESS:
CITY ________________________ STATE ________________
UNIT MODEL # ________________________________________
UNIT SERIAL # ________________________________________
Unit Installed Minimum clearances per
Figure 1 (page 4)?
YES NO
INSTALLER NAME:
CITY _______________________ STATE ________________
Has the owner’s information been
reviewed with the customer?
YES NO
Has the Literature Package been left
with the unit?
YES NO
VENTINGSYSTEM
Is the vent hood installed? YES NO
Is vent hood free from restrictions YES NO
Filter(s) secured in place? YES NO
Filter(s) clean? YES NO
ELECTRICAL SYSTEM
Electrical connections tight? YES NO
Line voltage polarity correct? YES NO
Rated Voltage: ___________________________________ VOLTS
L1-L2 Volts: _____________________________________ VOLTS
Has the thermostat been calibrated? YES NO
Is the thermostat level? YES NO
Is the heat anticipator setting correct? YES NO