GE PNRQ21RBN Water System User Manual


 
Installation Instructions
REVERSE OSMOSIS ASSEMBLY
MOUNTING SYSTEM INSTALLATION
Choose a location under the sink to mount the
system. Location should be easily accessible,
with adequate clearance between the bottom
of the filter cartridges and the floor or bottom of
the cabinet for removal of filter cartridges. Allow
enough space on either side of the system for the
tubing connections.
1. Remove the prefilter and postfilter cartridges.
2. Remove the assembly cover by unlocking the
four tabs on the cover from the system.
3. 8VHDIODWKHDGVFUHZGULYHUWRZRUNIURPOHIWWR
right from the underside of the system.
4. 8VHWKHLFRQVRQWKHERWWRPRIWKHV\VWHPIRU
screwdriver positioning.
5. Hold the Reverse Osmosis assembly up to
the wall surface where you wish to install it.
Mark location for screws. There should be a
minimum of 17 inches from the marks to the
bottom of the cabinet floor.
IMPORTANT ³ Do not get dirt or debris
inside the assembly area. Use only to mark
mounting hole locations.
6. Install screws to the wall, leaving a 3/16-inch
clearance between the head of the screw and
wall (drill pilot holes if needed).
7. Hang the Reverse Osmosis assembly on the
screws. Tighten or loosen the screws as desired
until the system is secure on the wall.
8. To install the cover, line up the front
tabs on the
cover with the
openings
in the system.
9. Snap the cover
in place; the
tabs will flex,
allowing the
cover to snap in
place.
10. Remove the
membrane
cartridge.
Screw locations
17
7
Screws
Screw
3/16
Wall
Screwdriver positioning
Screwdriver
System opening
Tab
Prefilter Postfilter
To removeTo remove
To remove
Membrane
10