1 Planning
Topics covered in this chapter:
Installation checklist
Best practices
Recommended sample flow rate
Power requirements
Installation requirements for the thermo-well pocket
Recommended installations for gas density applications
Perform a pre-installation meter check
1.1 Installation checklist
Verify the contents of the product shipment to confirm that you have all parts and
information necessary for the installation.
Part Quantity
Micro Motion
®
Gas Density Meter (GDM) 1
Accessories kit:
- M20 to 1/2-inch NPT adapter (if applicable)
- 1/2-inch NPT blanking plug
- 2.5 mm hex key
1
Aluminum sleeve 1
Silicon fluid 1
Thermo-well pocket kit (if applicable) 1
Calibration certificate 1
Safety instructions booklets 2
Micro Motion Product Documentation DVD 1
Make sure that all electrical safety requirements are met for the environment in
which the meter will be installed.
Make sure that the local ambient and process temperatures and process pressure
are within the limits of the meter.
Make sure that the hazardous area specified on the approval tag is suitable for the
environment in which the meter will be installed.
If installing the meter in a hazardous area, confirm that you have the required safety
barriers or galvanic isolators for your installation.
Make sure that you will have adequate access to the meter for verification and
maintenance.
Planning
Installation Manual 1